Agenda for Lethbridge Meeting 14 May All day FTS Working Group (P D-I providing detailed timetable) Afternoon Pointing Workshop 15 May All day FTS Introduction (P D-I providing detailed timetable) ICC Management Group meets during lunch break BBQ at Fort Whoop-Up 16 May 9:30 FT demo 10:30 ICC Meeting Intro DLC 10:45 Action Review DLC, KK 11:30 Coffee 11:45 E2E 2 Test Report SG/PP 12:15 Calibration status - any changes, needs, updates TL/EP 12:45 Lunch 1:45 Quality Control Intro DLC for GB Reports: Each module developer to report on progress with developing quality control metrics; aim to define metrics for each module PP EDP RG Detector processing RG Demodulation RG Flatfielding PP Pointing RG BSM NN Denodding DR Averaging DR User Products P Scan Map TF Spectrometer pipeline BS PCAL 3:00 Documentation Intro KK Reports: Each module developer to report on progress with documentation; aim to determine module requirements PP EDP RG Detector processing RG Demodulation RG Flatfielding PP Pointing RG BSM NN Denodding DR Averaging DR User Products P Scan Map P Jiggle Map TF Spectrometer pipeline BS PCAL 4:15 Coffee 4:30 Pipeline Design Changes - any updates from 1st 2 days on FTS and pointing or from MG et al. on bolometer handling etc. TL 5:15 End 6:00 Welcome by Bob Tarleck, the Mayor of Lethbridge at the Nikka Yuko Japanese Gardens, 9th Avenue South and Mayor Magrath Drive (Next to Henderson Lake). The gardens will be open to the SPIRE team until 7:00. 17 May 9:30 Requirements for tools in trend and interactive analysis TL/BS - 4 tasks to be convered during meeting: - instrument monitoring (Thursday) - trend analysis (Thursday) - calibration processing (Friday) - spectral visualisation and tools (Friday) - aim to identify tools for this, then set requirements for them and assign work packages 10:45 Training Plan - plan to train operations team members in 6 months before launch - KK 11:15 Coffee 11:30 Operations scenario review - real time - routine calibration offline - other offline activities - data retrieval and access - keeping pipeline versions up to date - uploading processed calibration files - trend analysis processing - calibration processing - update and maintenance of pipeline software patches or complete downloads? how to assess updates to pipeline user feedback (from consortium not general users) bug list and bug tracking 13:00 Lunch 14:00 Operations Scenario Review continues 15:30 Coffee 16:00 External Working Groups - all ICC reps. to report Editorial Board - Davide Documentation WG - Davide Product Definition WG - Steve System Architecture Group - Steve CCB - George DP Management Group - Steve System Engineering Group - Steve End to End test group - Dave DP Users Group - George 17:30 End 18 May 9:30 Module Status Review 9:30 PP EDP 9:40 RG Detector processing 9:50 RG Demodulation 10:00 RG Flatfielding 10:10 PP Pointing 10:20 RG BSM 10:30 NN Denodding 10:40 DR Averaging 10:50 DR User Products 11:00 Coffee 11:30 P Scan Map 11:40 TF Spectrometer pipeline 11:50 BS PCAL 12:00 General Module Discussion 12:30 Lunch 14:00 Requirements for tools TL/PD - 2 tasks to be convered today: - calibration processing - spectral visualisation and tools - aim to identify tools for this, then set requirements for them and assign work packages 15:30 Overflow 16:30 End